This document provides instructions for commissioning EVlink City, EVlink Parking, and EVlink Smart Wallbox charging stations in stand-alone mode. It covers initial connection procedures, network configuration including Ethernet and Wi-Fi setup, energy management strategies, authentication methods using RFID badges, and supervision settings via OCPP protocol. The guide includes detailed parameter configurations for charge points, power metering options, load balancing features, and cybersecurity recommendations. It also addresses maintenance procedures, firmware updates, charge data record management, and troubleshooting guidance. The document is intended for commissioning staff and facility managers responsible for installing and configuring these charging stations. Note: AI-generated document summary. Please check the original document for detailed information.
| Bestands- naam | |
DOCA0060EN-11.pdf |
Productgamma's: