Data Center Projects: Commissioning

Failure to properly commission a data center leaves the door wide open for expensive and disruptive downtime that could have been avoided. Integrated commissioning of all physical infrastructure components assures maximum data center performance and justi

Reference

Type du document

Langues

Date du document

Version

Fichiers

DBOY-6NJNK6_R1_EN (.pdf) 994,7 kb

ma liste

Afficher, e-mail, et partager vos documents favoris.

Voir Mes Documents
loader-lg loader-sm