Eight Strategies to Ensure Successful Retrofit of Pharmaceutical Manufacturing Automation Systems

This paper presents a range of proven best practices and project strategies for performing major system retrofits in GMP manufacturing facilities, using the successful case study at the Genentech CCP1 Facility in Vacaville, CA as an example.

Referencia

Tipo

Idiomas

Fecha

Versión

Documentos

LS Eight Startegies for Retrofit 110215 (.pdf) 794,7 kb

Mi Lista

Guarda, envía por email y comparte tus documentos y productos favoritos.

Ver mis Documentos
loader-lg loader-sm