Effective turbine controls for cogeneration facilities

This paper focuses not on turbine replacement, but on the upgrade/ replacement of the integrated governor and excitation system controls. In many instances, a control system upgrade will extend the life of existing turbines, avoiding costly refurbishment

Référence

Type

Langues

Date

Version

Fichiers

ID#267_998-19681874_GMA-US (.pdf) 1,9 mb

Mes documents

Stocker, envoyer, et partager vos documents et produits favoris.

Voir mes documents
loader-lg loader-sm