Welcome to the Schneider Electric Website

Welcome to our website.

Select your location

Welcome the the Schneider Electric French website. It looks like you are located in the United States, would you like to change your location?

Traduisez en francais

Factory Planner

Location(s):
Cavite (CALABARZON (Region IV-A)), Philippines
Categorie(s):
Logistics
Req ID:
006PIQ

Job Description

Great People make Schneider Electric a great company. 

Do you dream of working in a company that is driven by a meaningful purpose and that continuously creates an inclusive environment where you are empowered to do your best and be innovative?

The Role: Factory Planner

Manages the process of Production Planning and cell loading. Plans and coordinates the allocation of raw materials between facilities and other manufacturing sites (both internal & external) to optimize the production of division products based on the Master Production Schedule (MPS), raising the necessary heads-up on critical materials affecting the MPS build. Analyzes supply status and availability of Finished Goods from Distribution Centers (DC) worldwide and realigns Finished Goods supply for healthy stocking.

What will you do?

• Drives materials availability to support MPS build plan and works with Procurement team to ensure timely deliveries of raw materials

• Analyzes MPS misses on Line Item (LIPAS) and Volume Performance (VOLPAS) against Schedule and relates the impact of misses on the Backorder Report / Release Unshippable (RU)

• Prepares a Recovery Plan for products or product family with critical Distribution Center (DC) and in-transit Finished Goods (FGs) supply and communicates exemption report to Management team, Demand and Supply Chain (SCP) Corporate Planning group

• Projects possible backorders and requests the necessary changes in MPS to recover from the backlog • Reviews corporate sourcing report for DC allocation and shipments prioritization.

• Establishes priorities and sets logistics directions for specific customer order in product shortage situations.

• Works with New Product Development/Transfer (NPD/NPT) Planners and divisional management to ensure that prior to product transitioning, phase out product have healthy supply positions and material supplies pipeline for those being phased in are in place

• Works in tandem with Production Planning & Control (PPC) Planner for availability of locally supplied or Just in time (JIT) materials • Works with Engineering support team on parts with Engineering Change Order (ECO) affecting the products.

• Works with Operations team on manufacturing issues affecting the plan and escalates gap on any capacity constraints on resources - manpower, machine, method

• Works with Product or Mfg Engineering in looking for alternate parts or process improvements

• Follows thru timely preparation and release of ECO documentation for identified alternate parts

• Coordinates with Operations and Supply Chain team on inventory management and improve customer satisfaction.


Qualifications

Who would be successful?

What’s in it for me?

  • Global family leave
  • Comprehensive medical coverage for employee and dependents
  • Worldwide Employee Stock Ownership
  • Flexible work arrangement
  • On-site gym

…and more!

 

Who will you report to? Supply Chain Manager

 

Why us?

 

Schneider Electric is leading the digital transformation of energy management and automation. Our technologies enable the world to use energy in a safe, efficient and sustainable manner. We strive to promote a global economy that is both ecologically viable and highly productive. 

€25.7bn global revenue

137 000+ employees in 100+ countries

45% of revenue from IoT

5% of revenue devoted for R&D

 

Video Link: https://youtu.be/J0cFSdFpI24

 

Let us learn about you! Apply today.

 

You must submit an online application to be considered for any position with us. This position will be posted until filled.

 

It is the policy of Schneider Electric to provide equal employment and advancement opportunities in the areas of recruiting, hiring, training, transferring, and promoting all qualified individuals regardless of race, religion, color, gender, disability, national origin, ancestry, age, military status, sexual orientation, marital status, or any other legally protected characteristic or conduct.

 


Schedule: Full-time
Req: 006PIQ
<script> $(document).ready(function() { $('head').append('<meta name="apple-itunes-app" content="app-id=714825126">'); }); </script>
<!-- Start SmartBanner configuration --> <meta name="smartbanner:title" content="mySchneider"> <meta name="smartbanner:author" content="Schneider Electric SA"> <meta name="smartbanner:price" content="Free"> <meta name="smartbanner:price-suffix-apple" content=" - On the App Store"> <meta name="smartbanner:price-suffix-google" content=" - Google Play"> <meta name="smartbanner:icon-apple" content="//lh3.googleusercontent.com/lAVirntKlp63vbntUZvOkMvZI8fE4rIoA5Lwif9M09VxzFhcWE21sTDYqJqOqIPqg4m4=w300-rw"> <meta name="smartbanner:icon-google" content="//lh3.googleusercontent.com/lAVirntKlp63vbntUZvOkMvZI8fE4rIoA5Lwif9M09VxzFhcWE21sTDYqJqOqIPqg4m4=w300-rw"> <meta name="smartbanner:button" content="VIEW"> <meta name="smartbanner:button-url-apple" content="http://m.onelink.me/e5bff3e5"> <meta name="smartbanner:button-url-google" content="https://app.appsflyer.com/com.schneider.qrcode.tocase?pid=Web&c=Smart_app_bannerEG"> <meta name="smartbanner:enabled-platforms" content="android"> <!-- End SmartBanner configuration --> <link rel="stylesheet" href="[PublicationUrl]/assets-re1/css/smartbanner.min.css" /> <script type="text/javascript" src="[PublicationUrl]/assets-re1/js/smartbanner.min.js"></script>
Your browser is out of date and has known security issues. It also may not display all features of this website or other websites. Please upgrade your browser to access all of the features of this website. Internet Explorer 9 or higher is recommended for optimal functionality.

Chat

Do you have questions or need assistance? We’re here to help!