Reliability Analysis of the APC InfraStruXure Power System

  • Référence

    SPD_VAVR-5W5PF5_EN

  • Type

    Livre blanc

  • Langues

    Anglais

  • Date

    14/10/2014

  • Version

    V2

Télécharger
  • Référence

    SPD_VAVR-5W5PF5_EN

  • Type

    Livre blanc

  • Langues

    Anglais

  • Date

    14/10/2014

  • Version

    V2

Description :

The APC InfraStruXure product line offers an alternative architecture to the central UPS. MTechnology, Inc. used the techniques of Probabilistic Risk Assessment (PRA) to evaluate the reliability of the 40 kW InfraStruXure UPS and PDU with static bypass. The calculations considered the performance of the InfraStruXure in both ideal and real-world conditions. The study also compared the performance of the InfraStruXure architecture to that of a central UPS serving a hypothetical 500 kW critical load in a data center. The results showed that the InfraStruXure architecture was significantly less likely to suffer failure of all loads in the data center, and slightly less likely to experience failure in any one piece of IT equipment. This paper summarizes the key findings of MTechnologys quantitative risk assessment and discusses their implications for facility managers and designers.

Fichiers à télécharger

Ajouter au panier

Description :

The APC InfraStruXure product line offers an alternative architecture to the central UPS. MTechnology, Inc. used the techniques of Probabilistic Risk Assessment (PRA) to evaluate the reliability of the 40 kW InfraStruXure UPS and PDU with static bypass. The calculations considered the performance of the InfraStruXure in both ideal and real-world conditions. The study also compared the performance of the InfraStruXure architecture to that of a central UPS serving a hypothetical 500 kW critical load in a data center. The results showed that the InfraStruXure architecture was significantly less likely to suffer failure of all loads in the data center, and slightly less likely to experience failure in any one piece of IT equipment. This paper summarizes the key findings of MTechnologys quantitative risk assessment and discusses their implications for facility managers and designers.