CAD
Jezik
Format
Veličina
Datum
IPRI 48V
(Verzija 1.0)
Datoteke u dokumentu
all
prp.document.label.format
zip
Veličina
340.4 KB
Datum
09.07.13.
Datoteke u dokumentu
iPRC for Telecom network surge Arrester
(Verzija 1.0)
Datoteke u dokumentu
all
prp.document.label.format
zip
Veličina
712.2 KB
Datum
30.01.12.
Datoteke u dokumentu
iPRC for Telecom network surge Arrester
(Verzija 1.0)
Datoteke u dokumentu
all
prp.document.label.format
zip
Veličina
2 MB
Datum
30.01.12.
Datoteke u dokumentu
iPRI 48V surge Arrester
(Verzija 1.0)
Datoteke u dokumentu
all
prp.document.label.format
zip
Veličina
712.2 KB
Datum
30.01.12.
Datoteke u dokumentu
Bijela knjiga
Jezik
Format
Veličina
Datum
Bringing critical power distribution out of the dark and into a safer, more reliable, and efficient future
(Verzija 1.0)
Opis
Proven technologies exist today that can fully digitize the electrical distribution infrastructure of large and critical buildings and facilities. These are helping improve safety for people and assets, increase power reliability and business continuity, optimize operational and energy efficiency, achieve sustainability goals, and meet regulatory compliance. Yet, most organizations are still not taking advantage of these latest advances in power distribution connectivity and intelligence, some of which may already be in place in their facilities. Without this crucial last step, facility teams are working blind, unaware of many hidden risks and opportunities.
English
prp.document.label.format
pdf
Veličina
3.4 MB
Datum
09.07.18.
Opis
Proven technologies exist today that can fully digitize the electrical distribution infrastructure of large and critical buildings and facilities. These are helping improve safety for people and assets, increase power reliability and business continuity, optimize operational and energy efficiency, achieve sustainability goals, and meet regulatory compliance. Yet, most organizations are still not taking advantage of these latest advances in power distribution connectivity and intelligence, some of which may already be in place in their facilities. Without this crucial last step, facility teams are working blind, unaware of many hidden risks and opportunities.