EcoStruxure Process Expert Faster Switchover of Redundant Supervision Servers Application Note_ENG
This document describes how to tune an EcoStruxure Process Expert system as well as Participant and OPC Factory Server settings to improve communication and reduce the time it takes for the secondary Supervision server to assume control in case the primary server becomes inoperable. It does not describe how to use EcoStruxure Process Expert nor operate a SCADA system. It is written for users with a working knowledge of EcoStruxure Process Expert, AVEVA Plant SCADA, and OPC Factory Server.
Date:
19 Dec 2022|Type:
Application Notes
Languages:
English|Version: 01
Document Reference:
EIO0000004976
Files
File Name
EcoStruxure Process Expert Faster Switchover of Redundant Supervision Servers Application Note_ENG_EIO0000004976.00.pdf