Goal
Delivers optimal system performance and power reliability by minimizing the risk of equipment damage and unplanned downtime
Story
Commited to adhering to strict regulatory standards and electrical standards for patient’s comfort and safety, Mayapada Hospital finds the solution in Masterpact MTZ and EcoStruxure for Healthcare platform.
Solution
- Masterpact MTZ LV circuit breaker
- EcoStruxure Power Monitoring Expert
- EcoStruxure Building Operations
- EcoStruxure Power Advisor
Results
- Reduces unplanned downtime up to 99.99%
- Minimized risk of equipment damage
- Optimized energy usage throughout the infrastructure
- Up to 30% savings in energy
Delivers optimal system performance and power reliability by minimizing the risk of equipment damage and unplanned downtime
Story
Commited to adhering to strict regulatory standards and electrical standards for patient’s comfort and safety, Mayapada Hospital finds the solution in Masterpact MTZ and EcoStruxure for Healthcare platform.
Solution
- Masterpact MTZ LV circuit breaker
- EcoStruxure Power Monitoring Expert
- EcoStruxure Building Operations
- EcoStruxure Power Advisor
Results
- Reduces unplanned downtime up to 99.99%
- Minimized risk of equipment damage
- Optimized energy usage throughout the infrastructure
- Up to 30% savings in energy