Issue:
Looking for the ride through time for the ATV680/ATV980 active front end drives.
Product Line:
ATV680/ATV980
Environment:
All
Cause:
Ride through time
Resolution:
The ATV680 and ATV980 don’t fulfill the requirements of SEMI F47.The drive systems have an internal control voltage, which is generated from the mains supply, via a transformer.
If the mains voltage drops to -50%, all relays and contractors, will drop off.
For the drive products, it is easier to fulfil the SEMI F47 requirements, because the complete power
supply comes out of the DC bus.
As per attachment, you can find one page of the ATV980 handbook, where you can see the undervoltage specification of the ATV680/980.
| ||
Diterbitkan untuk: Schneider Electric Indonesia


Perlu bantuan?
Mulai di sini!
Temukan jawaban sekarang. Cari solusi sendiri, atau hubungi salah satu pakar kami.
Hubungi Dukungan
Hubungi tim layanan pelanggan kami untuk mendapatkan informasi lebih lanjut, bantuan teknis, penanganan keluhan, dan lainnya.
Tempat pembelian
Temukan distributor Schneider Electric terdekat di lokasi Anda dengan mudah.
Jelajahi FAQ
Dapatkan jawaban yang Anda butuhkan dengan menelusuri Pertanyaan yang Sering Diajukan (FAQ) berdasarkan topik.
Hubungi Bagian Penjualan
Silakan kirimkan pertanyaan terkait penjualan secara online dan pakar kami akan menghubungi Anda.