ASCO White Paper | Testing Hospital Backup Power Sources
To ensure patient safety, welfare, and satisfaction, electrical power must be available 24 x 365. For this reason, hospital backup power systems must be tested regularly to ensure they can provide electrical power when utility outages occur. This document provides an overview of the testing requirements and summarizes an approach for streamlining testing and compliance.
Date:
20 May 2020 | Type:
White paper
Languages:
English | Version:
Rev 1
Document Reference:
asc-ts-wp-thbps