TCO Analysis of a Traditional Data Center vs. a Scalable, Prefabricated Data Center

Standardized, scalable, pre-assembled, and integrated data center facility power and cooling modules provide a “total cost of ownership” (TCO) savings of 30% compared to traditional, built-out data center power and cooling infrastructure. Avoiding overbui

Riferimento

Tipo

Lingue

Data

Versione

File

WTOL-8NDS37_R1_EN (.pdf) 719 kb

La mia lista

Archivia, invia via e-mail e condividi i tuoi documenti e prodotti preferiti.

Visualizza i miei documenti
loader-lg loader-sm