Issue
A user needs to replace the integrated display on a PM800 series meter with the PM8D integrated display replacement part.
Product Line
PM800 series meter
Environment
PM800 series meter repair
Cause
A user is experiencing problems with a PM800 series meter integrated display and they want to know how to replace the integrated display with PM8D.
Resolution
The PM8D will come as a single display as shown in pictures below.
Front View:
Meter and Display back view:
Slots to pry up retaining clips:
*Warning: Installation and maintenance of this device should only be performed by qualified, competent personnel that have appropriate training and experience with high voltage and current devices. Failure to follow the instructions / warnings in the Meter Installation Guide can result in permanent damage to the meter, severe injury or death.
Before replacing the display:
- De-energize the meter (disconnect control power)
- Disconect line voltage and short out CTs at the installed CT shorting blocks
Below is a video showing how to remove the existing integrated display on a PM800 series meter and replace it with PM8D.
Опубликовано для: Schneider Electric Казахстан


Нужна помощь?
Инструмент для подбора продукции
Быстро и легко находите подходящие продукты и принадлежности для ваших условий применения.
Получить коммерческое предложение
Заполните заявку онлайн, и с вами свяжется наш эксперт.
Где купить?
Легко находите ближайшего к вам дистрибьютора Schneider Electric.
Центр поддержки
Находите ресурсы поддержки для всех ваших потребностей в одном месте.