TCO Analysis of a Traditional Data Center vs. a Scalable, Prefabricated Data Center

Standardized, scalable, pre-assembled, and integrated data center facility power and cooling modules provide a “total cost of ownership” (TCO) savings of 30% compared to traditional, built-out data center power and cooling infrastructure. Avoiding overbui

Referencia

Tipo

Idiomas

Fecha

Versión

Documentos

WTOL-8NDS37_R1_EN (.pdf) 719 kb

Mi Lista

Guarda, envía por email y comparte tus documentos y productos favoritos.

Ver mis Documentos
loader-lg loader-sm