Can the HDMPMHKIT27 wiring harness be used to add additional meters to an HDM enclosure?
Issue
A user would like to install additional meters into a HDM meter cabinet.
Product Line
PowerLogic® High Density Metering
Environment
HDM Enclosures Meter Installation
Cause
An auxiliary harness is needed to install additional meters in a HDM enclosure.
Resolution
The Auxiliary Harness Assembly Kit is used when adding a new row of meters to the metering cabinet in the PowerLogic® High Density Metering System.
The auxiliary harness accommodates up to four meters and is used in rows 2, 3, or 4 depending on the number of meters installed and the model of the cabinet.
The Auxiliary Harness Assembly Kit Instruction Bulletin is attached to this article.
A user would like to install additional meters into a HDM meter cabinet.
Product Line
PowerLogic® High Density Metering
Environment
HDM Enclosures Meter Installation
Cause
An auxiliary harness is needed to install additional meters in a HDM enclosure.
Resolution
The Auxiliary Harness Assembly Kit is used when adding a new row of meters to the metering cabinet in the PowerLogic® High Density Metering System.
The auxiliary harness accommodates up to four meters and is used in rows 2, 3, or 4 depending on the number of meters installed and the model of the cabinet.
The Auxiliary Harness Assembly Kit Instruction Bulletin is attached to this article.
Publisert for: Schneider Electric Norway








Trenger du hjelp?
Produktvelger
Velg riktige produkt og kompatibelt tilbehør raskt og enkelt.
Be om tilbud
Start din salgsforespørsel online, og vi vil kontakte deg.
Hvor kan du handle?
Finn din nærmeste Schneider Electric-distributør enkelt.
Hjelpesenter
Finn alle nødvendige supportressurser samlet på ett sted.