Como o podemos ajudar hoje?

How to Configure Monthly Reset of Peak Demand Power for a Meter in Power Monitoring Expert

Issue
There is no good way to reset Peak Demand on the PM800 series (among other Powerlogic Devices referenced)

Product Line
ION Enterprise
SPM7
Power Monitoring Expert (PME) 7.x
Power Monitoring Expert (PME) 8.x
Power Monitoring Expert (PME) 9.x
Power Monitoring Expert (PME) 2020
Power Monitoring Expert (PME) 2021
Power Monitoring Expert (PME) 2022
Power Monitoring Expert (PME) 2023
Power Monitoring Expert (PME) 2024

PM800

PM3000

BCPM

EM4000


Environment
PME Designer VIP

Resolution
The attached process will reset the Power Min/Max Demand at the start of every month, based on when the 'Clock' determines that a new month has began--not '30 days elapsed'.

This process can be used for other values that should be reset at the start of every month as well, so long as it is a value that the register is accessible via ION Enterprise.

Please check the attachments to download instruction file: 'Clock Based Reset Instructions'.

Schneider Electric Portugal

Anexo(s)
Clock Based Reset Instructions.pdf [291.49 KB]
Explorar mais
Produto:
Gama:
Explorar mais
Produto:
Gama:
  • Documentação dos Produtos
  • Transferências de Software
  • Ferramenta de Seleção de Produtos
  • Substituição e Troca do Produto
  • Centro de Ajuda e de Contacto
  • Encontre os nossos escritórios
  • Obter um orçamento
  • Onde adquirir
  • Comunidade Schneider Electric
  • Carreiras
  • Perfil da empresa
  • Comunicar uma má conduta
  • Acessibilidade
  • Newsroom
  • Investidores
  • EcoStruxure
  • Pesquisa de emprego
  • Blogue
  • Política de privacidade
  • Aviso sobre Cookies
  • Termos de utilização
  • Alterar suas configurações de cookie