Minimize generation system failures and ensure high plant availability. Maintain the highest levels of power quality, while reducing operating costs.
Solution & Benefits
A complete, scalable power and control solution, built for multi-site management and remote maintenance. Based on current standards, our solution combines all hydroelectric controls in one system.
> Reduce investment costs by up to 20%
> Lower maintenance costs by up to 30%
> Improve operational reliability
BC Hydro
BC Hydro upgrades existing aging Bailey control system at their Burrard Generating Station in Port Moody, to deliver higher levels of control and efficiency.
Find products and solutions
Modicon Premium
Modicon Quantum
Telemetry and Remote SCADA Systems
Documents and Downloads
Browse the Technical Library to find data sheets, production specifications and more.