Markalar

Impact-Company-Logo-English Black-01-177x54

Schneider Electric Web Sitesine Hoş Geldiniz

Web sitemize hoş geldiniz.
		
Size bugün nasıl yardımcı olabiliriz?
Video: How to add an alarm for Digital I/O with a delay in PME.

Issue
PowerLogic devices with digital I/O alarms do not have the ability to add delays.

Product Line

Power Monitoring Expert (PME) 8.X
Power Monitoring Expert (PME) 9.x
Power Monitoring Expert (PME) 2020
Power Monitoring Expert (PME) 2021
Power Monitoring Expert (PME) 2022
Power Monitoring Expert (PME) 2023
Power Monitoring Expert (PME) 2024


Cause
PowerLogic devices such as CM4000 and PM800 devices have the ability to alarm on digital input status changes. Unfortunately there is no way to program a delay into the logic.

Resolution
With PME 8 and later version with alarm configuration we now have the ability to add delays to digital alarms. Adding a delay would make the alarms more consistent with other alarms that have delays built into them.

Schneider Electric Turkey

Daha fazlasını keşfedin
Seri:
Daha fazlasını keşfedin
Seri:
  • Ürün Belgeleri
  • Yazılım İndirmeleri
  • Ürün Seçici
  • İkame Ürün ve Değiştirme
  • Yardım Merkezi
  • Ofislerimizi Bulun
  • Teklif Alın
  • Satış noktaları
  • Schneider Electric Topluluğu
  • Kariyer
  • Şirket Profili
  • Bir usulsüzlüğü bildirin
  • Erişilebilirlik
  • Haberler
  • Yatırımcılar
  • EcoStruxure
  • İş Araması
  • Blog
  • Gizlilik İlkesi
  • Çerez Bildirimi
  • Change your cookie settings