Swansea Case Study

As part of Swansea University’s ambitious regeneration project, St. Modwen needed to source a number of building management solutions to help make the campus one of the safest and most comfortable learning and living environments available.Schneider Electric was brought on board with the design and build of the campus on the back of a long-standing relationship with EFT Consult, thanks to its reputation for helping solve the challenge of providing an energy-efficient, appealing, secure campus, while maximising financial resources.

Swansea Case Study

Release date 01 Feb 2019
Version 1.0
Document ref. SE9559
File format PDF (2.3 MB)
File name | Size | Action SE9559_Swansea_Case_Study_2019.pdf 2.3 MB

Swansea Case Study

As part of Swansea University’s ambitious regeneration project, St. Modwen needed to source a number of building management solutions to help make the campus one of the

Release date 01 Feb 2019
Version 1.0
Document ref. SE9559
File format PDF (2.3 MB)
SE9559_Swansea_Case_Study_2019.pdf
Release date 01 Feb 2019
Version 1.0
File name SE9559_Swansea_Case_Study_2019.pdf
File format PDF