Swansea Case Study

As part of Swansea University’s ambitious regeneration project, St. Modwen needed to source a number of building management solutions to help make the campus one of the safest and most comfortable learning and living environments available. Schneider Electric was brought on board with the design and build of the campus on the back of a long-standing relationship with EFT Consult, thanks to its reputation for helping solve the challenge of providing an energy-efficient, appealing, secure campus, while maximising financial resources.

Reference

Type

Languages

Date

Version

Files

SE9559_Swansea_Case_Study_2019 (.pdf) 2.3 mb

Product Ranges:

My Documents

Store, email, and share your favourite documents and products.

View My Documents
loader-lg loader-sm