This document provides detailed instructions for installing, configuring, and commissioning the Schneider Electric Backup Control Switch BCS 2200 (865-BCS-2200). It covers safety guidelines, mounting procedures, wiring configurations for both service entrance and subpanel backup installations, connection to XW Pro inverters, power meter setup, and system verification procedures. The guide includes electrical and mechanical specifications, regulatory approvals, system diagrams for whole home backup and subpanel backup configurations, and operational instructions for the manual grid connection switch. It is intended for qualified personnel with training in electrical equipment installation and service entrance equipment setup. Note: AI-generated document summary. Please check the original document for detailed information.
Files
| File Name | |
BCS-InstallGuide-TME23564.pdf |
Create your Schneider Electric account today
Access personalized tools, programs and services