CAD
Ngôn ngữ
Định dạng
Kích cỡ
Ngày
CAD file (on TraceParts) for A9XPK707: Acti9 VDIS distribution block 33 holes
(Phiên bản 1.0)
Mô tả
You will be redirected to the Traceparts website. Register for free or log in to your Traceparts account to download more than 15 different 2D or 3D CAD formats.
Acti9 VDIS distribution block 3PN 125A 250/440V 33 connection points
(Phiên bản 1.0)
Tập tin trong tài liệu
all
prp.document.label.format
zip
Kích cỡ
1.7 MB
Ngày
5/28/18
Tập tin trong tài liệu
all
prp.document.label.format
dwg
Kích cỡ
2.4 MB
Ngày
5/28/18
Acti9 VDIS distribution block 3PN 125A 250/440V 66 connection points
(Phiên bản 1.0)
Tập tin trong tài liệu
all
prp.document.label.format
zip
Kích cỡ
2.8 MB
Ngày
5/28/18
Tập tin trong tài liệu
White paper
Ngôn ngữ
Định dạng
Kích cỡ
Ngày
Bringing critical power distribution out of the dark and into a safer, more reliable, and efficient future
(Phiên bản 1.0)
Mô tả
Proven technologies exist today that can fully digitize the electrical distribution infrastructure of large and critical buildings and facilities. These are helping improve safety for people and assets, increase power reliability and business continuity, optimize operational and energy efficiency, achieve sustainability goals, and meet regulatory compliance. Yet, most organizations are still not taking advantage of these latest advances in power distribution connectivity and intelligence, some of which may already be in place in their facilities. Without this crucial last step, facility teams are working blind, unaware of many hidden risks and opportunities.
English
prp.document.label.format
pdf
Kích cỡ
3.4 MB
Ngày
7/9/18
Mô tả
Proven technologies exist today that can fully digitize the electrical distribution infrastructure of large and critical buildings and facilities. These are helping improve safety for people and assets, increase power reliability and business continuity, optimize operational and energy efficiency, achieve sustainability goals, and meet regulatory compliance. Yet, most organizations are still not taking advantage of these latest advances in power distribution con