Reduced delays on Queensland Rail's busy inner-city network
Queensland Rail: Customer Story Key Outcomes
Increased network reliability for the 2018 Commonwealth Games and 1.5 million extra visitors
Smooth implementation of the solution, minimizing interruptions to commuters
Upgrade your aging equipment
Discover the benefits of modernizing your existing LV and MV switchgear to help cut costs and boost reliability.
Discover EcoStruxure
Learn how your business can achieve success with EcoStruxure: Innovation at Every Level.
The Challenge
• Reduce the number of power incidents which caused delays on Queensland Rail’s busy inner-city network in Brisbane• Build a more reliable system to help cope with 1.5 million extra visitors to the 2018 Commonwealth Games
• Install a new substation at Brisbane’s Fortitude Valley station, in a space allowing for just a 24-square foot (7.3 m2) container
• Carry out the work with minimal disruption to passengers
The Solution
Reliability with EcoStruxure Power
Edge Control: Citect SCADA
Connected Products: GHA Rail, Gutor PXC, Compact NSX
• A new substation using a range of solutions based on EcoStruxure Power
• These included the GHA Rail gas-insulated switchgear, MiCOM protection relays, a Gutor PXC industrial UPS system, Compact NSX circuit breakers, a compact LV Spacial SF enclosure, and Citect SCADA monitoring and control software
Reliability with EcoStruxure Power
Edge Control: Citect SCADA
Connected Products: GHA Rail, Gutor PXC, Compact NSX
• A new substation using a range of solutions based on EcoStruxure Power
• These included the GHA Rail gas-insulated switchgear, MiCOM protection relays, a Gutor PXC industrial UPS system, Compact NSX circuit breakers, a compact LV Spacial SF enclosure, and Citect SCADA monitoring and control software
The Results
• Minimized on-site work during the upgrade, avoiding as many interruptions to commuters as possible• Reduction in the number of incidents which impact the entire inner-city network, resulting in fewer delays to commuter services
• Overcame the challenge of ensuring power reliability for 1.5 million extra passengers during the Commonwealth Games
“We have increased patronage on the trains and we need more trains and more power to cope with the demand.”
Paul Rourke, Project Manager, Queensland Rail
Learn more

EcoStruxure Power

Geneva Airport Customer Story

Shanghai Metro

Medium-Voltage Distribution

Field and Automation Services
Have a story worth sharing?
Share your success with EcoStruxure and give your story the visibility it deserves.
Innovation Summits
See highlights from recent Innovation Summits and find out about the next event.