How can we help you today?

How to connect Advanced display v3 (AD v3) to EcoStruxure BMS Server?

AD v3 can use either a wired (USB) connection or a wireless (WiFi) connection to communicate with EcoStruxure BMS

• USB Connection
AD v3 uses a wired (USB) connection to communicate with SmartX servers (AS/AS-P/AS-B) and the device must be powered by a 24 VDC power supply.  AD v3 must be powered by a 24 VDC power supply. The Y-shaped cable, ordered separately (SXWADUSBC10002 or SXWADUSBC10003) enables data communication and power supply over a single cable. Only cables designed for AD v3 must be used. The required cables can be ordered from Schneider Electric.
AD V3 Wired connection

Wireless connection:
AD v3 connects to EcoStruxure BMS Server (ES/AS/AS-P/AS-B) via Wi-Fi. Wi-Fi module needs to be ordered separately.
AD V3 Wireless connection
Commercial References:
AD V3 commercial reference

Schneider Electric United Arab Emirates

Explore more
Range:
Users group

Discuss this topic with experts

Visit our Community for first-hand insights from experts and peers on this topic and more.
Explore more
Range:
  • Products Documentation
  • Software Downloads
  • Product Selector
  • Product Substitution and Replacement
  • Help and Contact Centre
  • Find our Offices
  • Get a Quote
  • Where to buy
  • Schneider Electric Community
  • Careers
  • Company Profile
  • Report a misconduct
  • Accessibility
  • Newsroom
  • Investors
  • EcoStruxure
  • Job Search
  • Blog
  • Privacy Policy
  • Cookie Notice
  • Change your cookie settings