Retrofitting the hotel meant facing two challenges. First, the prevalence of concrete throughout the building would make wiring difficult and costly in several circumstances. Second, taking rooms out of inventory during the retrofit would negatively imp
Fecha:
30 sept 2016| Tipo:
Casos de éxito de nuestros clientes
Idiomas:
Inglés| Versión:
2.1
Referencia del documento:
CSS-ALBERTATBAY-Case-Study
Archivos
Nombre del archivo
998-20032957_GMA-US_Albert At Bay Hotel_X1A_v3.pdf