This FAQ has been written for NEAL (North East Africa and Levant) region. If you are looking for information for another region, please select the correct country from the top-left dropdown in the page and 'Navigate to Browse FAQs' in the Support menu.
Feature 31 is selective Load disconnect circuit to provide a pre-transfer and/or post transfer signal when transferring from emergency to normal and/or normal to emergency. The signal can be programmed to occur during all transfers or only when the transfer is occurring between two live sources. The length of the pre and post transfer delays can be set to 0-5 minutes 59 seconds.
1. On Group G controller, from Main Menu > Settings > Features.

2. Select Controller Output contact OP1

4. Setting the corresponding time setting for Pre/Post transfer signal


Refer to this link for the Users guide for the Group G controller:
https://www.ascopower.com/us/en/download/document/ASC-TS-UM-300G-CONTROL/
1. On Group G controller, from Main Menu > Settings > Features.
2. Select Controller Output contact OP1
- By default, Controller Output contact OP1 is already available on the Group G controller.
- Adding accessory 18RX will enable Controller Output contact OP2 and OP3.
4. Setting the corresponding time setting for Pre/Post transfer signal
- From Main Menu > Settings > Timers
- These 4 parameters are the timers that can be set according to the need of application
- Set values accordingly.
Refer to this link for the Users guide for the Group G controller:
https://www.ascopower.com/us/en/download/document/ASC-TS-UM-300G-CONTROL/
Released for: Schneider Electric Egypt and North East Africa


Need help?
Product Selector
Quickly and easily find the right products and accessories for your applications.
Get a Quote
Start your sales enquiry online and an expert will connect with you.
Where to buy?
Easily find the nearest Schneider Electric distributor in your location.
Help Center
Find support resources for all your needs, in one place.