
Roll over image to zoom in




APC IT Power Distribution Module 3 Pole 5 Wire 32A IEC309 200cm
PDM3532IEC-200
Environmental Data
Environmental Data
Use Again
Take-back
Yes
Environmental Data
Schneider Electric aims to achieve Net Zero status by 2050 through supply chain partnerships, lower impact materials, and circularity via our ongoing “Use Better, Use Longer, Use Again” campaign to extend product lifetimes and recyclability.