Square D Current Transformer (CT) Installation Information

Issue
Customer needs basic installation and safety guidance for Square D / Schneider Electric current transformers (CTs), including polarity/orientation and safe handling of CT secondary wiring.

Product Line
Current Transformers (Square D / Schneider Electric)

Environment
Metering / Power Monitoring
Current Transformer (CT) installed on conductors/bus for metering or monitoring

Cause
Incorrect CT orientation (polarity), loose connections, or unsafe handling of the CT secondary (especially leaving the secondary open while primary current is flowing) can cause incorrect readings, equipment damage, and hazardous voltage conditions.

Resolution
Warning: Installation and maintenance of CTs and associated metering equipment must be performed only by qualified, competent personnel trained on electrical hazards and safe work practices. Failure to follow applicable instructions and warnings can result in equipment damage, severe injury, or death. Since these are broad instructions, please refer to the appropriate CT installation guide for your specific application.
  • Verify CT polarity/orientation before energizing:
  • For window-type CTs, install the CT so the marked polarity/source side (for example H1 or equivalent marking) faces the current source (line side), and the opposite side faces the load.
  • Use the CT’s polarity markings on the secondary (for example X1 polarity terminal) to maintain correct metering polarity when landing secondary wiring.
  • Do NOT open-circuit the CT secondary while primary current is flowing:
  • Never disconnect the CT secondary leads (or leave them loose/unlanded) while the CT primary conductor is energized.
  • If wiring changes are required, short the CT secondary first (using an approved shorting device/block) before disconnecting meter-side wiring.
  • Check workmanship and connection integrity:
  • Confirm all secondary wiring terminations are secure and tight.
  • Confirm the CT is properly seated/closed (split-core) or properly installed (solid-core) and is mechanically secure per the CT style/mounting method.
  • Post-install verification:
  • After installation, verify readings are reasonable and consistent (for example, compare phases; confirm the expected direction/sign of power where applicable).
  • If measurements appear incorrect, re-check CT orientation and secondary polarity wiring before assuming a device or meter failure.
  • See the attached image for additional CT installation notes, polarity/orientation examples, and safety reminders.
  • Complementary link: FA203850

    See attached file for more details. (The file needs to be downloaded to open)

슈나이더 일렉트릭 Korea

첨부 파일
ctinstallation.tif [1.01 MB]
자세히 알아보기
제품군
자세히 알아보기
제품군

도움이 필요하신가요?

도움이 필요하신가요?

제품 선택기

제품 선택기

애플리케이션에 적합한 제품과 액세서리를 빠르고 쉽게 찾을 수 있습니다.

견적 받기

견적 받기

영업 관련하여 온라인으로 문의하시면 전문가가 연락드립니다.

구매처

구매처

해당 지역의 가장 가까운 슈나이더 일렉트릭 대리점을 쉽게 찾을 수 있습니다.

지원 센터

지원 센터

한 곳에서 모든 요구 사항에 대한 지원 리소스를 찾아보십시오.

  • 제품 문서
  • 소프트웨어 다운로드
  • 제품 선택기
  • 제품 대체 및 교체
  • 지원 및 연락처 센터
  • 영업소 검색
  • 견적 받기
  • 슈나이더 일렉트릭 커뮤니티
  • 채용
  • 회사 소개
  • 부정 행위 보고
  • 접근성
  • 뉴스룸
  • 투자자
  • Ecostruxure
  • 작업 검색
  • 블로그
  • 개인정보 취급방침
  • 쿠키 공지
  • 사용 약관
  • Change your cookie settings