브랜드

Impact-Company-Logo-English Black-01-177x54

슈나이더 일렉트릭 코리아 웹사이트에 방문해 주셔서 감사합니다.

슈나이더 일렉트릭 코리아 웹사이트 방문자 분들 모두 환영합니다.
		
오늘 무엇을 도와드릴까요?
Is a Line Contactor ahead of the soft start required as referred to in the ATS22 users manual?

Issue:
Is a Line contactor required ahead of the soft start?

Product Line:
Altistart 22, ATS22

Environment:
All models and serial numbers

Cause:
None

Resolution:
The purpose of the line contactor is to provide a means of removing AC line voltage from the softstart.  Due to leakage currents through the solid state switches, hazardous voltages can be present on the load side of the softstarter when power is applied to the line side of the softstarter.
Also, the line contactor can be controlled to open if the ATS22 faults.  Some faults are the result of SCRs shorting.  If multiple SCRs fail in a shorted condition, full voltage power passes through and will either single phase or continue to run the motor.  The KM1 would interrupt  the power circuit.

A line or isolation contactor such as KM1 shown in wiring diagrams, located in the Annex of the ATS22 Users Manual (BBV51330) is strongly suggested but not required.

슈나이더 일렉트릭 Korea

자세히 알아보기
제품군
자세히 알아보기
제품군
  • 제품 문서
  • 소프트웨어 다운로드
  • 제품 선택기
  • 제품 대체 및 교체
  • 지원 및 연락처 센터
  • 영업소 검색
  • 견적 받기
  • 슈나이더 일렉트릭 커뮤니티
  • 채용
  • 회사 소개
  • 부정 행위 보고
  • 접근성
  • 뉴스룸
  • 투자자
  • Ecostruxure
  • 작업 검색
  • 블로그
  • 개인정보 취급방침
  • 쿠키 공지
  • 사용 약관
  • Change your cookie settings