On a M580 Hotstandby system, why the application cannot be transferred from Primary to Standby?
The M580 redundant system is made in a way that data related to tasks are exchanged between the Primary controller to the Standby at every cycle.

Synchronized situation :
At each cycle:
-          The Primary CPU “packs” the data in preparation to the transfer
-          The Primary CPU then starts to execute the application code of the task, and in parallel the data is being transferred to the Standby
-          Once the data are received, the Standby unpacks the data, and start executing its local code (depending on the configuration)
All of this should happen within the configured task (Mast of Fast) period in Unity Pro.

In this situation, simultaneous spare time exist in both CPUs at the end of the cycle, and an application transfer (low priority) can be managed by the system.

Not synchronized situation :
Depending on the tasks (mast of fast) execution duration, on the data transfer duration, and on the associated chosen periods, it is possible that the duration of the data transfer exceeds the task period, even if the primary tasks durations are lower than the period settings.
in this case, the primary CPU will not receive the data transfer acknowledge from the standby CPU, => the status of the standby task will be “not synchronized”.

In this situation, no simultaneous spare time exist in both CPU at the end of the tasks, and no application transfer can be managed by the system.

In order not to jeopardize the system, the Standby CPU will remain Standby, however, the indication that the data was not fully received during this cycle will be available in the system bit: ECPU_HSBY_1.MAST_SYNCHRONIZED (or ECPU_HSBY_1.FAST_SYNCHRONIZED)

According to your process, having the data not synchronized between Primary and Standby for several cycles might have an impact on your application. For instance, the system might not have enough time to transfer the application from Primary to Standby.

in order to analyze if there could be an impact, do the following:
-          Get the system in a stable state (Run Primary and Run Standby)
-          Connect to the Primary CPU with Unity Pro
-          Observe the Device DDT bit: MAST_SYNCHRONIZED and / or FAST_SYNCHRONIZED (if FAST used)
-          If MAST_SYNCHRONIZED and / or FAST_SYNCHRONIZED do not always show value = 1, then adjust the configured period online until this cycle is stable and MAST/FAST_SYNCHRONIZED are set to 1

another advice is to use these system bits in the logic of the application or in the Scada in order to trigger warnings
Feel free to contact your local Schneider Electric representative for additional information.

슈나이더 일렉트릭 Korea

자세히 알아보기
제품군
자세히 알아보기
제품군

도움이 필요하신가요?

  • 제품 선택기

    애플리케이션에 적합한 제품과 액세서리를 빠르고 쉽게 찾을 수 있습니다.

  • 견적 받기

    영업 관련하여 온라인으로 문의하시면 전문가가 연락드립니다.

  • 구매처

    해당 지역의 가장 가까운 슈나이더 일렉트릭 대리점을 쉽게 찾을 수 있습니다.

  • 지원 센터

    한 곳에서 모든 요구 사항에 대한 지원 리소스를 찾아보십시오.

  • 제품 문서
  • 소프트웨어 다운로드
  • 제품 선택기
  • 제품 대체 및 교체
  • 지원 및 연락처 센터
  • 영업소 검색
  • 견적 받기
  • 채용
  • 회사 소개
  • 부정 행위 보고
  • 접근성
  • 뉴스룸
  • 투자자
  • Ecostruxure
  • 작업 검색
  • 블로그
  • 개인정보 취급방침
  • 쿠키 공지
  • 사용 약관
  • Change your cookie settings