How long does it take an ATV630 to accept a run command after receiving line power?
Issue:
How long does it take an ATV630 to accept a run command after receiving line voltage?
Product Line:
Altivar Machines, Altivar 630
Environment:
All models and serial numbers
Cause:
Application design
Resolution:
Once line voltage is switched on, the ATV630 can accept a run command and start drawing current in 3 seconds.
If any further detail is needed, please contact Schneider Electric Drive Product Support Group.
How long does it take an ATV630 to accept a run command after receiving line voltage?
Product Line:
Altivar Machines, Altivar 630
Environment:
All models and serial numbers
Cause:
Application design
Resolution:
Once line voltage is switched on, the ATV630 can accept a run command and start drawing current in 3 seconds.
If any further detail is needed, please contact Schneider Electric Drive Product Support Group.
게시 대상: 슈나이더 일렉트릭 Korea




도움이 필요하신가요?
제품 선택기
애플리케이션에 적합한 제품과 액세서리를 빠르고 쉽게 찾을 수 있습니다.
견적 받기
영업 관련하여 온라인으로 문의하시면 전문가가 연락드립니다.
구매처
해당 지역의 가장 가까운 슈나이더 일렉트릭 대리점을 쉽게 찾을 수 있습니다.
지원 센터
한 곳에서 모든 요구 사항에 대한 지원 리소스를 찾아보십시오.