Does the SA26PS and SA26PSR Switchboard Pull Section meet the EUSERC requirements for Access Opening or Conduit Entry
With the SA8LL lug termination kit and based on the 2019 version of EUSERC standard 300, SA26PS and SA26PSR meet 345 drawing marked as "Revised" with no revision level or date note and indicates that the Access Opening requirement for 400-800 Amp Pull Sections is 24 inches Wide.
The SA26PS and SA26PSR have an Opening Access of 24 inches Wide as measured from the Interior Side Frames. The Overall Width of these sections is 26 inches. The Access Opening requirements should not be confused with the Conduit Entry opening. Currently, the Conduit Entry opening for these Pull Sections is 22.41 inches wide. The EUSERC standard drawings refer to Access Opening and not Conduit Entry. Please Note that EUSERC is a US standard intended for Electric Utilities.
It should be noted that in the 2014 version of the EUSERC standard 300; this drawing has revisions and date; Drawing 345 Rev.8 Dated 10/08.
The SA26PS and SA26PSR have an Opening Access of 24 inches Wide as measured from the Interior Side Frames. The Overall Width of these sections is 26 inches. The Access Opening requirements should not be confused with the Conduit Entry opening. Currently, the Conduit Entry opening for these Pull Sections is 22.41 inches wide. The EUSERC standard drawings refer to Access Opening and not Conduit Entry. Please Note that EUSERC is a US standard intended for Electric Utilities.
It should be noted that in the 2014 version of the EUSERC standard 300; this drawing has revisions and date; Drawing 345 Rev.8 Dated 10/08.
게시 대상: 슈나이더 일렉트릭 Korea


도움이 필요하신가요?
제품 선택기
애플리케이션에 적합한 제품과 액세서리를 빠르고 쉽게 찾을 수 있습니다.
견적 받기
영업 관련하여 온라인으로 문의하시면 전문가가 연락드립니다.
구매처
해당 지역의 가장 가까운 슈나이더 일렉트릭 대리점을 쉽게 찾을 수 있습니다.
지원 센터
한 곳에서 모든 요구 사항에 대한 지원 리소스를 찾아보십시오.