Link150/EGX150 - How to remotely power cycle
Issue
During troubleshooting, there may be a need to power cycle a Link150 gateway remotely. Power cycling the gateway releases existing connections which can allow other software to communicate to the 7801 port for example, which only allows 1 connection at a time.
Product Line
Link150/EGX150
Environment
Link150 Web Server
Resolution
*Warning: Installation and maintenance of this device should only be performed by qualified, competent personnel that have appropriate training and experience with high voltage and current devices. Failure to follow the instructions / warnings in the Meter Installation Guide can result in permanent damage to the meter, severe injury or death.
1. Log into the Link150 web page. Refer to https://www.se.com/us/en/faqs/FA299649/ for the default login information.
2. Navigate to the Settings tab > Communication > IP Network Services:
3. Check or uncheck the box to enable ION Pass Through, then click Apply Changes. The Link150 will reboot.
4. Refresh the page and log back into the Link150 web server.
5. Repeat the above steps to set the ION Pass Through back to its previous setting, which will reboot the Link150 again.
게시 대상: 슈나이더 일렉트릭 Korea
도움이 필요하신가요?
제품 선택기
애플리케이션에 적합한 제품과 액세서리를 빠르고 쉽게 찾을 수 있습니다.
견적 받기
영업 관련하여 온라인으로 문의하시면 전문가가 연락드립니다.
구매처
해당 지역의 가장 가까운 슈나이더 일렉트릭 대리점을 쉽게 찾을 수 있습니다.
지원 센터
한 곳에서 모든 요구 사항에 대한 지원 리소스를 찾아보십시오.