브랜드

Impact-Company-Logo-English Black-01-177x54

슈나이더 일렉트릭 코리아 웹사이트에 방문해 주셔서 감사합니다.

슈나이더 일렉트릭 코리아 웹사이트 방문자 분들 모두 환영합니다.
		
오늘 무엇을 도와드릴까요?
M251/M241 What happens to the program (boot application) if there is a power outage and there is no battery (or it expired and it was not replaced)

->Issue:

What happens to the program (boot application) if there is a power outage and there is no battery (or it has expired and it was not replaced)

->Product Line:

Machine Expert

->Resolution:

The battery only works to keep the internal clock running while there's no power in the PLC. It has nothing to do with the project being loaded into the controller.

The boot program is stored in the flash memory, which does not require battery backup; in case of a power outage you won't lose the program.

You can clone the application on an SD Card and have it as a backup just in case you need to put it into a replacement PLC if the PLC happens to be damaged in the future.

If this FAQ did not solve your issue, you can chat with us at chat with us or e-mail us at customer.services@se.com to create a case with our Technical Support Team.If you are not located in North America, please contact your local Customer Care Center for assistance:Support | Schneider Electric Global (se.com)

슈나이더 일렉트릭 Korea

자세히 알아보기
제품군
자세히 알아보기
제품군
  • 제품 문서
  • 소프트웨어 다운로드
  • 제품 선택기
  • 제품 대체 및 교체
  • 지원 및 연락처 센터
  • 영업소 검색
  • 견적 받기
  • 슈나이더 일렉트릭 커뮤니티
  • 채용
  • 회사 소개
  • 부정 행위 보고
  • 접근성
  • 뉴스룸
  • 투자자
  • Ecostruxure
  • 작업 검색
  • 블로그
  • 개인정보 취급방침
  • 쿠키 공지
  • 사용 약관
  • Change your cookie settings