Mechanical retrofit and turbine controls upgrade
In Samrangjin, Korea, the operation team at a power plant realized that in order to maintain a stable power supply, they needed to pump water into their storage only during periods of low electricity demand.
Date:
24 January 2017 | Type:
Customer success story
Languages:
English | Version:
1.1
Document Reference:
PAS_63680_CPM16161
Files
Mechanical retrofit and turbine controls upgrade
In Samrangjin, Korea, the operation team at a power plant realized that in order to maintain a stable power supply, they needed to pump water into the
Date:
24 January 2017
Type:
Customer success story
Languages:
English
Version:
1.1
Files