Issue: Due to a synchronization issue of the Hot Standby FDR servers in CPU A and B, if a switch over is performed the ethernet distributed equipment module can be affected and be in error status.
To remind :The PMESWT0100 SCAIME ethernet distributed equipment module gets his configuration (.prm) files from the FDR server of the Primary CPU .
Following a switchover, if the prm file of new primary CPU is different from the one located in the new standby CPU then the SCAIME module will detect the difference and will move in error voluntarily.
Note that: The transfer of the prm files is done by using the DTM browser connected to the CPU.
Modifications of SCAIME module configuration has to be saved in the FDR server of each CPU “A” & “B”.
Work-Around: Procedure is proposed in the attached document
Fix :The issue of synchronisation mode between the two servers will be fixed on the next version SV2.70 of the M580 HSBY firmware.
Chapters to refer in Unity Pro Help.
“Working with M580 Hot Standby Applications”
“PME SWT\ Adding a Third-Party Module to a Unity Pro Project”
"PME SWT\Device configuration transfer from Unity Pro”
"Synchronizing Configuration of Distributed Equipment"
Đã phát hành cho: Schneider Electric Việt Nam




Bạn cần trợ giúp?
Bắt đầu ở đây!
Tìm câu trả lời ngay. Tự tìm kiếm giải pháp, hoặc kết nối với một trong các chuyên gia của chúng tôi.
Liên hệ hỗ trợ
Liên hệ với nhóm chăm sóc khách hàng của Schneider để nhận thêm thông tin, được hỗ trợ kỹ thuật, trợ giúp khiếu nại và các thông tin khác.
Nơi mua hàng?
Dễ dàng tìm nhà phân phối Schneider Electric gần bạn nhất.
Tìm kiếm câu hỏi thường gặp
Nhận câu trả lời bạn cần bằng cách duyệt tìm những Câu hỏi thường gặp (FAQ) liên quan đến chủ đề.
Liên hệ bộ phận bán hàng
Đăng ký bán hàng trực tuyến và chuyên gia của chúng tôi sẽ liên hệ với bạn.