Issue:
The purpose of using Power Chute Network Shutdown with a redundant UPS configuration is to confirm that an event is occurring on all UPS before sending a shutdown signal to the connected servers.
Product Line:
Power Chute Network Shutdown
Environment:
All support OS
Cause:
Informational
Solution:
Information concerning configuring PCNS with redundant UPS can be found at this linkApplication Note #98
Publié pour:Schneider Electric Belgium

