En quoi pouvons-nous vous aider aujourd'hui ?

Square D Current Transformer (CT) Installation Information

Issue
Customer needs basic installation and safety guidance for Square D / Schneider Electric current transformers (CTs), including polarity/orientation and safe handling of CT secondary wiring.

Product Line
Current Transformers (Square D / Schneider Electric)

Environment
Metering / Power Monitoring
Current Transformer (CT) installed on conductors/bus for metering or monitoring

Cause
Incorrect CT orientation (polarity), loose connections, or unsafe handling of the CT secondary (especially leaving the secondary open while primary current is flowing) can cause incorrect readings, equipment damage, and hazardous voltage conditions.

Resolution
Warning: Installation and maintenance of CTs and associated metering equipment must be performed only by qualified, competent personnel trained on electrical hazards and safe work practices. Failure to follow applicable instructions and warnings can result in equipment damage, severe injury, or death. Since these are broad instructions, please refer to the appropriate CT installation guide for your specific application.
  • Verify CT polarity/orientation before energizing:
  • For window-type CTs, install the CT so the marked polarity/source side (for example H1 or equivalent marking) faces the current source (line side), and the opposite side faces the load.
  • Use the CT’s polarity markings on the secondary (for example X1 polarity terminal) to maintain correct metering polarity when landing secondary wiring.
  • Do NOT open-circuit the CT secondary while primary current is flowing:
  • Never disconnect the CT secondary leads (or leave them loose/unlanded) while the CT primary conductor is energized.
  • If wiring changes are required, short the CT secondary first (using an approved shorting device/block) before disconnecting meter-side wiring.
  • Check workmanship and connection integrity:
  • Confirm all secondary wiring terminations are secure and tight.
  • Confirm the CT is properly seated/closed (split-core) or properly installed (solid-core) and is mechanically secure per the CT style/mounting method.
  • Post-install verification:
  • After installation, verify readings are reasonable and consistent (for example, compare phases; confirm the expected direction/sign of power where applicable).
  • If measurements appear incorrect, re-check CT orientation and secondary polarity wiring before assuming a device or meter failure.
  • See the attached image for additional CT installation notes, polarity/orientation examples, and safety reminders.
  • Complementary link: FA203850

    See attached file for more details. (The file needs to be downloaded to open)

Schneider Electric Belgium

Pièce(s) jointe(s)
ctinstallation.tif [1.01 MB]
En savoir plus
Gamme :
En savoir plus
Gamme :

Besoin d'aide ?

Besoin d'aide ?

Sélectionnez le bon produit

Sélectionnez le bon produit

Trouvez rapidement et facilement les produits et accessoires adaptés à vos applications.

Obtenir un devis

Obtenir un devis

Effectuez une demande de renseignements en ligne et un expert vous contactera.

Où acheter ?

Où acheter ?

Trouvez facilement le distributeur Schneider Electric local le plus proche.

Centre d'aide

Centre d'aide

Trouvez des ressources de support pour tous vos besoins, en un seul endroit.

  • Documentation produits
  • Téléchargement de logiciels
  • Sélecteur de produits
  • Substitution et remplacement de produits
  • Centre d'aide et de contact
  • Trouver nos sites
  • Obtenir un devis
  • Où acheter
  • Communauté Schneider Electric
  • Carrières
  • Qui sommes-nous ?
  • Signaler une mauvaise conduite
  • Accessibilité
  • Salle de presse
  • Partenaires
  • EcoStruxure
  • Nos emplois
  • Blog
  • Soyez informé des nouveautés en premier ?
  • Protection des données
  • Mention sur les cookies
  • Conditions d utilisation
  • Conditions générales de vente et d'achat
  • Change your cookie settings