Contactors fail to pass incoming inspection, contacts do not close.Contactors should be tested under load, not with a digital meter. This is true even for devices that are in service.
See the attached paper.
Publié pour:Schneider Electric Belgium
Pièce(s) jointe(s)Ohmic verification of power contacts.docx [77.42 KB]