{}

Nos marques

Bienvenue sur le site Web de Schneider Electric

Bienvenue sur notre site Web.

Consulter notre FAQ

EM4900 Installation: Using Voltage/Potential Transformers

Issue
User may need to use PTs when installing the EM4900 series meters and may not know that they do NOT have the option to program PT ratios in their configurations.

Product Line
EM4900

Environment
Installation

Cause
BCPM and EM4900 series meters do not have the option to program PT ratios in their configurations.

Resolution
The user may use PTs to step down the input control power and measurement voltages as required, but will need to compensate for the ratios when reading the meter's outputs, in the case of the measurement voltages.
For example, if a PT of ratio 480:120 is used, one will need to multiply all the output values, with the exception of the current, by a factor of 4.

Kindly refer to the link below for the EM4900 series documentation:

FA324770

Schneider Electric Belgium

En savoir plus
Gamme :
PowerLogic BCPMNP High LineEM4900 series
Catégorie :
Electrical Distribution ServicesPower Monitoring & Control
En savoir plus
Gamme :
PowerLogic BCPMNP High LineEM4900 series
Catégorie :
Electrical Distribution ServicesPower Monitoring & Control