{}

Nos marques

Bienvenue sur le site Web de Schneider Electric

Bienvenue sur notre site Web.
Consulter notre FAQ
How long does it take an ATV630 to accept a run command after receiving line power?
Issue:
How long does it take an ATV630 to accept a run command after receiving line voltage?

Product Line:
Altivar Machines, Altivar 630

Environment:
All models and serial numbers

Cause:
Application design

Resolution:
Once line voltage is switched on, the ATV630 can accept a run command and start drawing current in 3 seconds.

If any further detail is needed, please contact Schneider Electric Drive Product Support Group.

Schneider Electric Belgium

En savoir plus
Gamme :
Articles utiles
En savoir plus
Gamme :