{}

Nos marques

Bienvenue sur le site Web de Schneider Electric

Bienvenue sur notre site Web.
En quoi pouvons-nous vous aider aujourd'hui ?
Can I add a delay in a script action in Vijeo Designer V6.2
There is no delay script method in Vijeo Designer.  It is not recommended to create a loop as a workaround since it can make the HMI very slow and effect the communication or even lock up the HMI
If you are calling the script from a switch , you can split your script in half and add a delay operation.  This delay operation is only available from a switch operation.  So if the script is called from a local or global action it cannot be done.

If this FAQ did not solve your issue, you can chat with us at chat with us or e-mail us at customer.services@se.com to create a case with our Technical Support Team.

If you are not located in North America, please contact your local Customer Care Center for assistance:
Support | Schneider Electric Global (se.com)

Schneider Electric Belgium

Pièce(s) jointe(s)
VJDScript_delay.jpg [178.66 KB]
En savoir plus
Gamme :
Articles utiles
En savoir plus
Gamme :