How to complete the swtichboard with plates for PrismaSet Active in eDesign Small Building
Product Line: eDesign Small Building Small Building App
Cause: Basically, today after mounting all the components you think you have finished the project, but you must Add all the plates to finish the project.
Resolution:
- After configuring all your products, move to Front Face tab.
- Then Mount all your established products.
- Select the option View with faceplates from ENVELOPE section on the right side and click Add the finishing faceplates to complete your project.
- You can see the plates are added before you finish your project.
Publié pour: Schneider Electric Belgium
Besoin d'aide ?
Sélectionnez le bon produit
Trouvez rapidement et facilement les produits et accessoires adaptés à vos applications.
Obtenir un devis
Effectuez une demande de renseignements en ligne et un expert vous contactera.
Où acheter ?
Trouvez facilement le distributeur Schneider Electric local le plus proche.
Centre d'aide
Trouvez des ressources de support pour tous vos besoins, en un seul endroit.