Issue:
IEC code in the PLC not available for upload.

Product Line:
Concept programming software.
Cause:
Either the project was downloaded before Concept 2.5 SR2 which is when IEC upload was added or
The IEC upload switch was not engaged when the project was originally downloaded.
Resolution:
There is no workaround for this problem.
The customer can avoid it in the future by opening the project offline and going to <Project><Code generation options...> and
checking <Include IEC upload information>. This should be followed by a full download to the PLC.
IEC code in the PLC not available for upload.
Product Line:
Concept programming software.
Cause:
Either the project was downloaded before Concept 2.5 SR2 which is when IEC upload was added or
The IEC upload switch was not engaged when the project was originally downloaded.
Resolution:
There is no workaround for this problem.
The customer can avoid it in the future by opening the project offline and going to <Project><Code generation options...> and
checking <Include IEC upload information>. This should be followed by a full download to the PLC.
Released for: Schneider Electric Egypt and North East Africa


Need help?
Product Selector
Quickly and easily find the right products and accessories for your applications.
Get a Quote
Start your sales enquiry online and an expert will connect with you.
Where to buy?
Easily find the nearest Schneider Electric distributor in your location.
Help Center
Find support resources for all your needs, in one place.