How can we help you today?
Why does Control Expert display a CPU load 90% when the PLC is configured in Cyclic mode?
Issue:
Starting with Control Expert V16.4, a CPU load indicator is displayed in the status bar when connected to a PLC. When the MAST task is configured in Cyclic mode, the CPU load indicator is displayed in orange at 90%, even for a simple or empty application. This behavior may be interpreted as a controller overload, although it is expected.
Environnement:
- Control Expert V16.4 and later
- PLC configured with a Cyclic MAST task
Resolution:
This behavior is expected and does not indicate a controller overload.
The CPU load indicator displayed in the Control Expert status bar reflects the value of%SW116 (Total System CPU Load). When the MAST task is configured in Cyclic mode, the controller continuously executes the application without any idle time between scans. Consequently,%SW116 reports a CPU load of approximately 90%, even for simple or empty applications.
In Periodic mode, the CPU load is generally more representative of the actual processing margin because task execution is based on a configured period.
Released for: Schneider Electric Indonesia
Explore more
Range:
Explore more
Range:
Need help?
Product Selector
Quickly and easily find the right products and accessories for your applications.
Get a Quote
Start your sales enquiry online and an expert will connect with you.
Where to buy?
Easily find the nearest Schneider Electric distributor in your location.
Help Centre
Find support resources for all your needs, in one place.