A user needs to replace the integrated display on a PM800 series meter with the PM8D integrated display replacement part.
Product Line
PM800 series meter
Environment
PM800 series meter repair
Cause
A user is experiencing problems with a PM800 series meter integrated display and they want to know how to replace the integrated display with PM8D.
Resolution
The PM8D will come as a single display as shown in pictures below.
Front View:
Meter and Display back view:
Slots to pry up retaining clips:
*Warning: Installation and maintenance of this device should only be performed by qualified, competent personnel that have appropriate training and experience with high voltage and current devices. Failure to follow the instructions / warnings in the Meter Installation Guide can result in permanent damage to the meter, severe injury or death.
Before replacing the display:
- De-energize the meter (disconnect control power)
- Disconect line voltage and short out CTs at the installed CT shorting blocks
Below is a video showing how to remove the existing integrated display on a PM800 series meter and replace it with PM8D.
Released for: Schneider Electric Ireland


Need help?
Where to buy?
Easily find the nearest Schneider Electric distributor in your location.
Search FAQs
Search topic-related frequently asked questions to find answers you need.
Contact Sales
Start your sales enquiry online and an expert will connect with you.
All Support & Contact
Find answers now. Search for a solution on your own, or connect with one of our experts.