How can we help you today?
How to startup or turn the STS250 on ?
Follow the below steps :
1 - Check that the two sources are energized (voltage present).
2 - Set circuit breakers Q4 and Q6 to the ON position (position 1).
3 - Turn switch Q1BP to the ON position (position 1). The load is supplied by Source 1 via the bypass.
4 - Set switches Q1 and Q3 to the ON position (position 1).
5 - Turn switch Q1BP back to the OFF position (position 0).
6 - Set switch Q2 to the ON position (position 1). The load is supplied by Source 1
1 - Check that the two sources are energized (voltage present).
2 - Set circuit breakers Q4 and Q6 to the ON position (position 1).
3 - Turn switch Q1BP to the ON position (position 1). The load is supplied by Source 1 via the bypass.
4 - Set switches Q1 and Q3 to the ON position (position 1).
5 - Turn switch Q1BP back to the OFF position (position 0).
6 - Set switch Q2 to the ON position (position 1). The load is supplied by Source 1
Released for: Schneider Electric India
Explore more
Range:
Explore more
Range:
Need help?
Product Selector
Quickly and easily find the right products and accessories for your applications.
Get a Quote
Start your sales enquiry online and an expert will connect with you.
Where to buy?
Easily find the nearest Schneider Electric distributor in your location.
Help Centre
Find support resources for all your needs, in one place.