{}

Our Brands

Impact-Company-Logo-English Black-01-177x54

Welcome to the Schneider Electric Website

Welcome to our website.
How can we help you today?
How M580 data of unlocated and located variable saved in persistent memory in every scan cycle.
Save the CPU project in the flash memory (and the memory card if inserted):
  • Automatically after an online modification is performed in the application RAM
  • Automatically after a download
  • Automatically on detection of %S66 system bit rising edge
  • Manually with a Unity Pro command: PLC → Project Backup → Backup Save
NOTE: Backup begins after the completion of the current MAST cycle and before the start of the next MAST cycle.
If MAST is configured as periodic, set the MAST period to a value larger than the actual MAST execution time. This lets the processor complete an entire backup without interruption.
If the MAST period is set to a value less than the actual MAST execution time, backup processing is fragmented and requires a longer time to finish.

Schneider Electric India

Explore more
Range:
Articles that might be helpful Users group

Discuss this topic with experts

Visit our Community for first-hand insights from experts and peers on this topic and more.
Explore more
Range: