오늘 무엇을 도와드릴까요?

What is a USF fault on the ATS48 (or ATS46) Soft Starters?

Issue:
Why is my ATS48 tripping on USF faults?
Product line:
Altistart ATS48 and ATS46
Environment:
All models, all serial numbers
Cause:
When a Run command is given, the mains voltage on L1 L2 L3 is absent for 350msec.
Resolution:
The soft start checks for three-phase AC power at the L1, L2, and L3 terminals as soon as a RUN command is received. This fault appears if the soft start has a RUN command and does not have line power in all three phases within 350 ms. This fault is stored in the fault history. Probable cause on a soft start with separately supplied control power:
• The line-supply circuit breaker, line fuses, or isolation contactor is open.
• The power board is defective.
• Determine why the three-phase power is not present at the L1, L2, and L3 terminals of the soft start when it receives a RUN command. Rectify the power supply problem.
• Verify the soft start's line voltage detection circuit by supplying only control voltage and verifying that nLP displays. Then apply a three phase line voltage and verify that RDY displays. If not, verify all internal soft start connections. If no problem is found, replace the power board.

슈나이더 일렉트릭 Korea

첨부 파일
ATS48 Y Range basic.pdf [1.78 MB]
자세히 알아보기
제품군
자세히 알아보기
제품군

도움이 필요하신가요?

도움이 필요하신가요?

제품 선택기

제품 선택기

애플리케이션에 적합한 제품과 액세서리를 빠르고 쉽게 찾을 수 있습니다.

견적 받기

견적 받기

영업 관련하여 온라인으로 문의하시면 전문가가 연락드립니다.

구매처

구매처

해당 지역의 가장 가까운 슈나이더 일렉트릭 대리점을 쉽게 찾을 수 있습니다.

지원 센터

지원 센터

한 곳에서 모든 요구 사항에 대한 지원 리소스를 찾아보십시오.

  • 제품 문서
  • 소프트웨어 다운로드
  • 제품 선택기
  • 제품 대체 및 교체
  • 지원 및 연락처 센터
  • 영업소 검색
  • 견적 받기
  • 슈나이더 일렉트릭 커뮤니티
  • 채용
  • 회사 소개
  • 부정 행위 보고
  • 접근성
  • 뉴스룸
  • 투자자
  • Ecostruxure
  • 작업 검색
  • 블로그
  • 개인정보 취급방침
  • 쿠키 공지
  • 사용 약관
  • Change your cookie settings