브랜드

Impact-Company-Logo-English Black-01-177x54

슈나이더 일렉트릭 코리아 웹사이트에 방문해 주셔서 감사합니다.

슈나이더 일렉트릭 코리아 웹사이트 방문자 분들 모두 환영합니다.
		
오늘 무엇을 도와드릴까요?
Meter wiring troubleshooting for Powerlogic series meters
Issue
A user would like to verify wiring on a Powerlogic series meter

Product Line
PM600 series
PM800 series
CM2000 series
CM3000 series
CM4000 series

Environment
Powerlogic series metering

Cause
It may be desirable for a user to check meter wiring for general verification or troubleshooting purposes.

Resolution
A quick check for proper readings consists of kW comparison (calculated per equation and compared to the meter reading) and a reasonable lagging 3-phase average power factor reading.
Information regarding this check, as well as further troubleshooting methods can be found in the attached "Verify_Meter_Readings" document.

If the meter values are similar to the calculated values, and are within the expected range, there is no reason to proceed with troubleshooting. If this is not true, additional phasor diagram verification will need to ensue. Reference the attached documents ("Phasor_diagram_Verification_3wire" or "Phasor_diagram_Verification_4wire") for detailed information regarding this step. The respective Phasor diagram tools required can be found attached below.

슈나이더 일렉트릭 Korea

첨부 파일
Verify_Meter_Readings.pdf [31.89 KB]
Phasor_diagram_Verification_3wire.pdf [39.21 KB]
Phasor_diagram_Verification_4wire.pdf [19.07 KB]
Phasor_Diagram_Tool_CM3_CM4.xls [38 KB]
Phasor_Diagram_Tool_PM6_CM2.xls [27 KB]
자세히 알아보기
제품군
자세히 알아보기
제품군
  • 제품 문서
  • 소프트웨어 다운로드
  • 제품 선택기
  • 제품 대체 및 교체
  • 지원 및 연락처 센터
  • 영업소 검색
  • 견적 받기
  • 슈나이더 일렉트릭 커뮤니티
  • 채용
  • 회사 소개
  • 부정 행위 보고
  • 접근성
  • 뉴스룸
  • 투자자
  • Ecostruxure
  • 작업 검색
  • 블로그
  • 개인정보 취급방침
  • 쿠키 공지
  • 사용 약관
  • Change your cookie settings