How to update multiple loadables in ProWORX NxT
Goals and Symptoms
How to update multiple loadables in ProWORX NxT
Facts and Changes
All versions of ProWORX NxT
Causes and Fixes
'ProWORX NxT' does not allow the update of multiple loadables at the same time. If more than 1
loadable needs to be updated, the update must be performed one at a time.
The following example updates the ESI loadable which also includes the NSUP loadable.
- Open the project.
- Click on 'Configuration' from the top menu bar and select 'Configuration'.
- Click on 'User Loadables'
- Click on first loadable to be updated (i.e., NSUP) in the Loadables in database window.
- Click on the Update button.
- Find the the executable file (i.e., NSUP.exe) and select it.
- Click on the OK to close the Select Loadable File window.
- Click on the OK in the 'Update Successful' message box.
- Click on the OK to save the changes and to close the Controller Configuration window.
- Repeat the process to update the next loadable. (i.e., ESI)
게시 대상: 슈나이더 일렉트릭 Korea


도움이 필요하신가요?
제품 선택기
애플리케이션에 적합한 제품과 액세서리를 빠르고 쉽게 찾을 수 있습니다.
견적 받기
영업 관련하여 온라인으로 문의하시면 전문가가 연락드립니다.
구매처
해당 지역의 가장 가까운 슈나이더 일렉트릭 대리점을 쉽게 찾을 수 있습니다.
지원 센터
한 곳에서 모든 요구 사항에 대한 지원 리소스를 찾아보십시오.